Domestic
6.4kW solar and 10kWh battery, Surrey
South-facing array with a battery scheduled against a dual tariff. Installed in two days.
- 71%
- less grid power
- £1,430
- first-year saving
South-facing array with a battery scheduled against a dual tariff. Installed in two days.
Phased across three units over six weeks with zero operational downtime.
Rolling refurbishment with insulation upgrades completed ahead of programme.
Survey capture, scheduling and asset history replacing three spreadsheets and a whiteboard.